Basement/Block Wall - Crawl Space - Floor Joist Applications
*1
System R-Value: R- 5.7 Horizontal Heat Flow Only System R-Value: R- 8.12 Horizontal Heat Flow Only
Basement Wall Application
Please note that these are two different applications with different R-values. Measure wall area to determine square footage of Low-E
Insulation required (length x height). Roll out material and fasten as per diagram with ½” staples approximately every 6”. To achieve a
vapor barrier, all seams and stud faces must be taped securely with Low-E tape.
*1
SYSTEM R-VALUES FOR HORIZONTAL HEAT FLOW, WITH ONE ENCLOSED AIR SPACE, INCLUDES AN ADDITIONAL 1.70 STILL AIR FILM
®
FOR EXPOSED SIDE OF ESP LOW-E
*2
SYSTEM R-VALUES FOR HEAT FLOW DOWN, WITH ONE ENCLOSED AIR SPACE, INCLUDES AN ADDITIONAL 4.55 STILL AIR FILM
®
FOR EXPOSED SIDE OF ESP LOW-E
*2
System R-Value: R- 11 Downward Heat Flow Only
System R-Value: R- 20.20, Downward Heat Flow Only
Crawl Space Application
Floor Joist Application
®
ESP Low-E can be used under your floor in a crawlspace to stop any air infiltration and add high insulating value to your floors. In a
crawlspace application can achieve as high as an R-11. will not mold, mildew or absorb moisture, so once it’s
installed there is virtually no maintenance involved. In areas where flooding is a problem will eliminate the concern of
your insulation system performing below average.
This Installation is for basement / crawlspaces with a 2” x 8” joist minimum. Insulation is installed across the bottom face
of the joist. ALL R-VALUES ARE SYSTEM R-VALUES. AN
ENCLOSED AIR SPACE MUST BE MAINTAINED TO
ACHIEVE THESE VALUES. IF THE BOTTOM SURFACE OF
THE LOW-E INSULATION MUST BE COVERED BY
ANOTHER SURFACE, R-VALUE MAY BE LOWER.
Measure entire joist area to determine square footage of
Insulation required(length x width). Roll out material and
fasten to bottom of floor joist with 1/2” staples every 6”. To
achieve a vapor barrier, all seams must be taped securely with
Low-E tape.
® ®
ESP Low-E ESP Low-E
®
ESP Low-E
®
ESP Low-E
ESP
®
Low-E
Measure entire joist area to determine square footage of Insulation required(length x width). We recommend
16” or 24” tab material. Roll out material and fasten to inside of floor joist in the center of the cavity by stapling 3/4” tabs as per diagram
to right with 1/2” staple every 6”. To achieve a vapor barrier, all seams must be taped securely with Low-E tape.
® ®
ESP Low-E ESP Low-E
SYSTEM R-VALUES FOR THESE INSTALLATION METHODS WERE CALCULATED USING DATA FROM THE ASHRAE HANDBOOK OF FUNDAMENTALS
10.